Groundsure Agricultural up to 50 hectares

£315.00

£378.00 (inc. VAT)

Built in conjunction with property lawyers and PSLs, the Groundsure Agricultural Report provides a detailed manual assessment of contaminated land risk, alongside a comprehensive review of agricultural features, flood, ground stability, radon, current and planned energy features and transportation, planning constraints and 10 years of planning data.

Key Features:

• Satisfies Law Society Practice Notes on Contaminated Land and Flood Risk and enhanced guidance on Section B8 of the Law Society Conveyancing Handbook

• Comprehensive contaminated land assessment, with detailed commentary on working farmyards, utilising the most comprehensive data available including Groundsure’s Historical Land Use Database, environmental permits, active and historic landfill and waste sites and current industrial sites

• Flood risk assessment covering river, coastal, surface water, groundwater and FloodScore™

• National Grid gas pipeline and electricity transmission lines

• Hydrology and Hydrogeology

• Historic and Current Rights of Way – Open Access Land

• Agricultural Land Classification, indicating the land’s potential productivity

• Planning development extents:

• Boundary extents for many recent large development projects dating back to May 2020 clearly illustrated
• Improved accuracy highlighting the area of land to be developed
• Large developments are considered to be residential builds of 10 or more houses (or 1-9 units if value is greater than £1m) and all other projects with a value of £250,000 or more.

• Planning Constraints including ancient or protected woodland

• Assessment of archaeological sites of interest

• Timber felling licenses

• Waste exemptions

• Environmental and Countryside Stewardship Schemes

• Discharge consents

• Nitrate Vulnerable Zones

• Natural and non-natural ground stability assessment including natural ground subsidence, cavities and non-coal mining

• Coal mining screening

• Detailed radon potential data

• Energy data covering existing and proposed oil and gas sites, including fracking, wind installations, solar farms, power stations, and major energy infrastructure

• Comprehensive transportation information provides detail on major rail projects including HS2, Elizabeth Line (Crossrail 1) & Crossrail 2, active and historic railways and tunnels and underground systems, including the London Underground

Key Benefits

• Practical expertise: in-house environmental consultants offer pragmatic and agricultural focused expert insight

• Transaction support: easy to understand client ready copy, accessible to everyone involved in the transaction

• All in one report: now include relevant peripheral infrastructure and planning information in one report

• Enhanced guidance on Section B8 of the Law Society Conveyancing Handbook

If a report identifies ‘Action Required’, it is often due to current permits or other potentially contaminative activities having been identified.


Turnaround time:

Up to 5 working days

Example Report